Discover how the renovation of an old church has met low-energy standards. For this project, internal insulation was carried out using 30 cm hemp blocks, providing optimal thermal regulation and enhancing the living comfort of the occupants.
A wall heating system was integrated, and the interior finishes were done with clay plaster, ensuring a healthy and 100% natural atmosphere.
The IsoHemp hemp blocks proved essential for ensuring effective acoustic and thermal insulation, while respecting the building’s durability.
Architect: Reinier de Gooijer
Contractor: Kloppenburg Stroen Leemnouw
Year of completion: 2018